Construction Update: October 29, 2015

Just a stone’s throw from the estuary, workers are putting finishing touches on the 2nd floor patio of Phoenix Commons (Pic. 1). Meanwhile, on the street side, windows and doors to the bicycle storage and workshop room have been installed (Pic. 2). New curbs on the frontage road lead to the main entrance of Phoenix Commons and its waterfront patios beyond (Pic. 3).

For more photos, follow us on Facebook and Google+!

PC_Site_20151029a

PC_Site_20151029b

PC_Site_20151029c